Phase two of the second container terminal at the Port of Mombasa
Construction of Phase two of the second container terminal at the Port of Mombasa is now complete. The new berth 22 with a total quay length of 300 metres brings ana additional 450,000 TEUs pushing the capacity of the Port of Mombasa to 2.1 million TEUs annually.